Sustainable Logistics Center in Upper Austria

 

Success Story: Planning & Implementation of 35 Loading Stations

For our client, we had the opportunity to realize a truly exceptional project: the complete planning, supply, and installation of loading technology for a new, sustainably designed logistics center in Upper Austria. We took full responsibility not only for delivering the technical components but for the holistic execution of all 35 loading stations—from initial needs analysis and engineering design through to final commissioning. The entire construction project was carried out under extreme time pressure and yet was completed on schedule, safely, and to the highest quality standards. This achievement underscores our role as a reliable partner for complex logistics infrastructure projects in Austria—especially when deadlines, quality, and sustainability are equally critical.

Customized Logistics Solutions for Maximum Efficiency

As part of the project, a total of 35 loading stations were installed, all engineered for maximum efficiency, safety, and operational reliability. Each station was precisely tailored to the building’s structural conditions and the client’s operational requirements to ensure smooth loading and unloading processes even during peak daily operations. Component selection—from dock levelers and door seals to control systems—was consistently guided by criteria such as durability, ease of maintenance, and energy efficiency. The concept is complemented by 10 interior high-speed doors that serve as flexible zone separators. These doors enable clear spatial division within the approximately 10,900 m² warehouse hall, significantly optimizing internal logistics workflows. At the same time, they support compliance with hygiene or temperature-related zoning requirements—depending on the area—and reduce unnecessary energy losses through rapid opening cycles.

Challenge: Extremely Tight Construction Schedule for a Large-Scale Project

The planning and execution timeline for the entire site—comprising a logistics building of over 10,900 m² and an attached office wing of 800 m²—was exceptionally tight. The handover date was fixed early on, leaving virtually no room for delays. All trades therefore worked under significant time pressure. Our task was to deliver and install the loading technology on schedule—without compromising on quality or safety. Thanks to our decades of experience in loading technology, industrial doors, and end-to-end project management, we were able to plan precisely, identify bottlenecks early, and respond flexibly. Close coordination with architects, general contractors, and the client was crucial—and demonstrates how vital seamless collaboration is on large-scale projects to deliver top performance even under pressure.

Award for Sustainability: State Prize 2014

This logistics center was awarded the Austrian State Prize for Architecture and Sustainability in 2014—a rare and prestigious recognition proving that ecological responsibility, economic efficiency, and architectural quality can be successfully combined. The energy-efficient building envelope, resource-conserving construction methods, and intelligent building technology all contributed to this honor—as did the long-term-oriented infrastructure, which includes our loading technology. Our durable systems with minimal energy consumption (e.g., through tight seals and fast door cycles) make a measurable contribution to the overall sustainability balance, underscoring that sustainability begins right at the loading dock.

Our Contribution: Future-Proof Infrastructure from a Single Source

We are proud to have played a decisive role in this pioneering project through the planning and implementation of 35 loading stations and 10 high-speed doors. With this, we not only enhanced the site’s logistical performance but also created a future-proof, low-maintenance, and energy-efficient integrated solution that will operate reliably and economically for years to come.

Your Advantage:

With Weglehner, you get everything from a single source—from expert planning and supply to professional installation of loading stations, dock levelers, and industrial doors. This ensures maximum planning security, short communication channels, and a seamless project workflow—even under the most demanding conditions. Especially in complex, time-critical projects like this one, such comprehensive support is a key success factor.

News - Weglehner Ges.m.b.H. - Logistics Center OÖ 1 News - Weglehner Ges.m.b.H. - Logistikzentrum OÖ 2News - Weglehner Ges.m.b.H. - Logistikzentrum OÖ InnenansichtNews - Weglehner Ges.m.b.H. - Logistikzentrum OÖ 3

You may also be interested in

News - News – Fast Action Gate – Weglehner Ges.m.b.H.

Self-Repairing High-Speed Door

Self-Repairing High-Speed Door learn more
News - News – New Development – Door Seal for Refrigerated Vehicles – Weglehner Ges.m.b.H.

Door Seal for Cold Chain Logistics

Door Seal for Cold Chain Logistics learn more
News - News – Full Transparency for Your Safety – Weglehner Ges.m.b.H.

Full Visibility for Your Safety

discover now Full Visibility for Your Safety
News - News – Double Parker – Weglehner Ges.m.b.H.

Double‑Parking Systems – Now in Our Program

learn more Double‑Parking Systems – Now in Our Program
News - News – Hydraulic Overhead Bridge Railway Gate – Image 3 – Weglehner Ges.m.b.H.

Hydraulic Transfer Bridge – Dock Leveller

discover now Hydraulic Transfer Bridge – Dock Leveller
News - News – Fall Protection Special Construction – Weglehner Ges.m.b.H.

Fall Protection as a Special Design

Fall Protection as a Special Design discover now
Repair Request